Industry |
Client |
Project Title |
Description |
Aerospace |
Boeing Tennessee |
High Bay Modification |
..Modified
2-60,000 CFM surplus air handlers for high bay service. |
|
|
Fab Expansion |
..800
tons of centrifugal chillers, gas heat air handlers, and Class 200,000 clean room. |
|
|
Material Storage & Handling |
..HVAC
design for hazardous materials storage building. |
|
Boeing Seattle |
Spares Distribution Center |
..250,000
sq. ft. conventional HVAC. |
|
McDonnell Douglas |
Facility Refurbishment |
..Conceptual
design for refurbishment of aircraft facilities. |
Automotive |
Reliance Electric, (Rogersville,
TN) |
Heat Treat Facility |
..Mechanical ventilation of facility housing 3 heat treat
lines. |
|
|
Oil Mist Removal |
..Electrostatic
precipitators for removing airborne oil mist from machining and grinding operations. |
Chemical Process |
Rohm & Haas, (Knoxville, TN) |
Control Room |
..Computer and control room air conditioning |
Environmental |
Nucor Steel (Crawfordsville, IN) |
PSD Permit |
..Assist with dispersion modeling and State negotiations
for PSD air permit of new mini-mill. |
|
Lockheed Martin (Oak Ridge, TN) |
Carbon Filter |
..Co-inventor
of semi-permanent self-cleaning carbon fiber composite indoor air quality filter. |
|
|
Treatability Studies |
..Generated
radionuclide concentrations from lab hood for NESHAPS compliance. |
Government |
Army Corps of Eng. |
Rolling Mill |
..Conceptual design of depleted uranium rolling mill
ventilation and exhaust system. |
|
Dept. of Energy |
Electroless Nickel Plating |
..Chemical
plating tank ventilation with run-around heat recovery. |
|
|
Feed Materials Processing |
..Conceptual
design for ventilation improvements of rare earth material handling facilities. |
|
|
Energy Conservation |
..Concept,
savings analysis, and engineering economy of industrial energy conservation projects. |
|
|
Crucible Cleaning Facility |
..Pulse
cleaning bag house filtration of process exhaust. |
|
|
Multi-Axis Milling |
..Glove
box ventilation and cooling in nitrogen atmosphere. |
|
|
Dual Y-Z Dimensional Inspection |
..Laminar
airflow clean room with +- 0.25 deg. F temperature profile. |
|
|
Microfilm Storage |
..Field
constructed water cooled DX air conditioning system. |
|
|
Upgrade Air Conditioning |
..240
ton centrifugal chiller and cooling coil installation. |
|
Monsanto |
Tape Processing Facility |
..10,000
sq. ft. Class 10,000 clean room. |
|
United States Postal Service
(Knoxville, TN) |
General Mail Facility |
..200,000
sq. ft. office and mail handling facility with 2-200 ton centrifugal chillers, hot water
VAV boxes, and 700 point energy management system. |
Metals |
Alcoa Aluminum |
Computer Room |
..Air conditioning with chemisorbent media filtration. |
|
|
Office Building |
..Rooftop
air conditioning with electronic VAV controls. |
|
Nucor Steel |
Mini Mill |
..Subgrade
DC motor ventilation for hot, cold reversing, and temper mills. |
|
North Star Steel |
Tundish Lancing |
..Process
exhaust improvement study and design. |
|
Manufacturing Sciences |
Headquarters Facility |
..50,000
sq. ft. uranium rolling mill facility with hooded exhaust system containing HEPA filters
(60,000 CFM) |
Pharmaceutical |
Syntex
(Bolder, CO) |
Process Tank Ventilation |
..Carbon scrubber for exhaust vents from chemical process
tanks. |
Rubber |
Bridgestone USA |
Passenger Tire Facility |
..650,000 sq. ft. of new manufacturing space, mostly H
& V. |
|
(LaVergne, TN) |
Creel Room |
..Kathabar
dehumidifying & cooling |
Transportation |
Purolator (Indianapolis) |
Air Hub |
..400,000 sq. ft. package sorting facility with infrared
heating and mechanical ventilation. |
|
UPS
(Chattanoga) |
Truck Facility |
..75,000
sq. ft. sorting and truck handling, ventilated and radiant heat. |
|
Federal Express |
Hanger #8 Ventilation |
..Improve
mechanical ventilation for airplane storage hanger. |
Commercial |
Provident Life & Accident |
UPS System |
..2000 KVA UPS and 750 ton-hour ice storage. |
|
Developer |
Greggory's Restaurant |
..10,000
sq. ft. exclusive dining with roof top HVAC. |
Microelectronics |
Coors Technical Ceramics
(Oak Ridge) |
Automated Part Cleaning |
..Class 100 and Class 10,000 clean room. |